BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//wp-events-plugin.com//7.2.3.1//EN
TZID:America/Denver
X-WR-TIMEZONE:America/Denver
BEGIN:VEVENT
UID:126@staythetrail.org
DTSTART;TZID=America/Denver;VALUE=DATE:20211010
DTEND;TZID=America/Denver;VALUE=DATE:20211011
DTSTAMP:20211005T173847Z
URL:https://staythetrail.org/events/iron-mike-work-project/
SUMMARY:Iron Mike Work Project
DESCRIPTION:STT is partnering with CORE to perform a volunteer day. The pr
 oject will include installing a kiosk sign near the beginning of the trail
 \, hardworking some of the old water bars for drainage\, installing a winc
 h anchor\, blocking a bypass\, and slashing the bypass route.
CATEGORIES:STT Project
END:VEVENT
BEGIN:VTIMEZONE
TZID:America/Denver
X-LIC-LOCATION:America/Denver
BEGIN:DAYLIGHT
DTSTART:20210314T030000
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
END:DAYLIGHT
END:VTIMEZONE
END:VCALENDAR